Overengineering

December 4, 2012

“Overengineering” is anathema to most product manufacturers. Generally, manufacturers desire to put no more time and money into a product than is necessary. They decide upon a reasonable lifespan for a product, and then they use materials and parts that, with rare exception, have been proven to last that long.  They do not care to produce a product that lasts longer than the consumer desires; they do not want to invest resources where they won’t see a return.

An exception to this general rule is invoked by those manufacturing products which, if they break, will kill or maim people.  Airplanes are the classic example:  they’re built with multiple redundancies and with materials and parts that have been tested to last much longer than necessary. The potential for catastrophic loss of life demands this. They will use a part that’s tested to last 20 years, and replace it after ten years just to be safe.

I suspect that some observers of the MHSAA’s recent campaign to increase sports safety training for coaches and modify playing rules that may endanger participants are critical that we’re asking too much, that we’re doing more than is necessary. But frankly, that’s exactly what we intend.  When it comes to participant safety, overengineering of policies and procedures ought to be our goal.

Leadership Impressions- #2 (Plugging Holes)

June 12, 2018

Almost every issue that affects youth is an issue that parents, politicians or the public is asking schools – and especially school sports – to solve.

Already consumed with efforts to promote participant health and safety in terms of heads, heat and hearts, our association is asked also to concentrate on mental health issues.

Having already addressed risks of tobacco, alcohol and performance-enhancing drugs, our association is asked also to campaign against opioid addiction.

State high school associations do not have the luxury to hire as many experienced people as they need to focus expertly on every topic that associations are asked to address.

The effect of this “person-power” shortage is to force the association’s executive director to be a utility player – an employee who can operate competently at many different positions, bringing time and prestige to the cause du jour.

Even the most forward thinking leader must be prepared to roll up sleeves and plug these holes in the team’s roster. This requires, again, that other staff be trusted to administer their assigned tasks without commanding the leader’s ongoing attention.